YEAR 2012 TETFund HIGH IMPACT SPECIAL INTERVENTION PROJECTS. (PHASE 4 BATCH 2) 

SUPPLY AND INSTALLATION OF LABORATORY EQUIPMENT FOR DEPARTMENT OF CIVIL ENGINEERING TECHNOLOGY (LOT1)

  PELTON TURBINE DEMONSTRATION UNIT MODEL FM62


CENTRIFUGAL FAN DEMONSTRATION UNIT MODEL FM40                                                PROPELLER  TURBINE MODEL FM63

 

GROUND WATER FLOW UNIT MODEL S11                                                            PRESSURE SURGE PIPE & WATER HAMMER APPARATUS

 

  CAVITATION DEMONSTRATION F1-28 OSBORNE REYNOLDS DEMOSTRATION MODEL F1-2 GEAR PUMP DEMONSTRATION UNIT MODEL FM52

AIR ENTRAINMENT METRE 0.75L CAPACITY                                    SERIES/ PARALLEL PUMP DEMONSTRATION MODEL FM51